Match reamed the hinge doublers to the front spar on both elevators.
Punched out the 5/8" trim cable hole. Make sure you drill the correct hole! Used a unibit or step bit.
Cleco'ed the front spar to the bottom skin on both elevators.
Added the rib assemblies to the left elevator.
Added the rib assemblies to the right elevator.
Cleco'ed the rear spar to both elevators.
Match reamed the shear clip to the rear spar and matching rib.
Reamed the outermost holes on the rear spar to full size.
Match reamed the rear spar to the rib assemblies.
Match reamed the root rib to the spars. These are #40 holes on purpose. Do not drill to #30.
Match reamed the front spar to the rib assemblies.
Match reamed the trim cable inspection cover doubler to the bottom skins.
No comments:
Post a Comment