Today I got started with all the wing spar countersinking.....after the screw holes are countersunk, that will have been about 554 holes countersunk give or take a few.

So Vans has you countersink all the nutplate mounting holes flush.  They also have you countersink the holes that just intersect the ribs and spare flanges flush since they don't go thru the skin.

Next they have you countersink the rest of the 3/32 holes -0.007" from flush that have rivets that come thru the skin.  There are a bunch of them!










Next I spot primed all the nutplate mounting holes with self etching rattle can primer.



 And then deburred all the nutplate mounting holes on the back side.


Finally I placed all the nutplates, ready for riveting and ran out of time!


Tuesday, August 6, 2019

Monday, August 5, 2019

Wing spar match drilling to wing J stiffeners

So for some weird reason Van's has you use the wing spar to match drill the holes for the wing skin J stiffeners.  I imagine they have you do this because it is hard to do it the old fashioned way by aligning a center line in the wing skin holes.  I guess it is too far to expect someone to be able to reach or something.  Anyway some people have made a mistake here and mis-drill these.  Thankfully I read about that elsewhere before and this was not a problem for me.  Thanks to all the people that came before me!

They have you clamp the stiffeners to the wing spar flange.


The stiffener should stick up above the spar flange by 1/16".


Then match drill it to the spar flange holes.  I used a cleco in every other hole.


Yep, that is a bunch of holes!


For the bottom side, they have you skip the area that gets inspection plate nutplates.  Those don't exist on the wing skin where the J stiffeners go so you don't want those holes match drilled here in the wrong place.


Both sides done.  Something like 164 holes per spar!

Saturday, August 3, 2019

Inventory and started working on wings!

So my wife and I started today by completing the inventory on all the hardware and parts for the wing kit.  We just counted the parts and the bags of hardware.  I do not count each nut and bolt in each bag.  I just look at them and if they look about right then that is good enough.  A missing nut or screw here and there is not a deal breaker and not going to make or break this project.  I would rather spend my hours building vs counting every screw or nutplate.





All the parts and bags were accounted for. 


Next I got started with the spars.  These things are over 12' long and heavy!  Love the beautiful gold anodizing!  Amazing workmanship on these things!


 Important to know which side is fore and aft and which is top and bottom!  Don't want to make a mistake so I marked them on all four sides for easy ID!

 Next I deburred and finished the edges on the wing spar extensions.


 Did the same on the wing spar extension doubler plates.

 I then cleco'ed the extensions to the spars using the doubler plates.  I marked all 8 of them and their location.
.
 Then match drilled them all together. 

 Then I marked the 4ea J stiffener's @ 92.25"
 And cut them on the bandsaw.

 Next I marked 4 more J stiffeners @ 53.75".

 And cut them on the bandsaw.


Finally I spent some time deburring them and rounding the corners.

Tuesday, July 30, 2019

Storing Tail Cone and Emp Parts

So yesterday I totally disassembled the emp parts from the tail cone and loaded them in the truck and transported them to the hangar for storage.

Everything made the trip with no damage or lost parts :)



When I get time, I need to hang the parts up out of the way and get a table to leave the tail cone on to help prevent damage.  The cheap harbor freight blankets will do for now.


Thursday, July 18, 2019

Oshkosh!

We blast off to Osh tomorrow morning.  No airplane building until we return all recharged with tons of vitamin RV!

Wednesday, July 10, 2019

Wings have arrived!

So the wings finally arrived.  Vans missed their lead time and projection a little bit and it took a few extra days for ABF to decide to deliver my kit so this added up to about 3 extra weeks I was not expecting for lead time.

ABF canceled delivery three days in a row and ended up delivering my kit at about 7PM on a day where they claimed the delivery would take place between 9-5. 

When the truck finally arrived, I found that the spar box was in great shape but the other crate was busted open, missing part of the lid, bottom panel pulled loose, two metal bands missing, and the skids on the bottom broken off.






Thanks ABF!  You are now officially 0 for 3 kits (RV7 kits included) that you managed to deliver to be without severely damaging the crate!

 At first I figured there was no way that the contents would be intact and or not damaged.  Much to my surprise it appears that everything is still in there!  I have to do a complete inventory to be sure but it is looking good so far.




 Those beautiful spars are like airplane porn!




After pulling everything out and getting a look at it, all the parts seem to be undamaged.  The skins are OK  and while I still need to do a complete inventory to make sure nothing fell out, it looks like I got lucky!